Decatur Next

Decatur Diary | November 7, 2023

Residents Provide Input on South Columbia Multi-Use Path; Still Time to Take the Survey

In late October, interested Decatur residents attended a preliminary open house to share thoughts on the final phase of the multi-use path connecting Talley Street Upper Elementary with the East Decatur Greenway. The forthcoming work will extend the path from its current end at Legacy Park’s north entrance south to Katie Kerr Drive.

For those unable to attend, there is now an online survey where you can chime in on how the project should be designed.

First, get up to speed by reviewing the displays:

Context Map (1.8mb PDF)
Site Map (5.6mb PDF)
Legacy Park Master Plan (19.3mb PDF)
Inspiration Images (2.6mb PDF)
Design Factors (2.1mb PDF)
Slope Analysis (4.5mb PDF)

Then, take the survey to share your input. Submissions will be accepted until Wednesday, November 15.

What’s Next?

Once a concept plan has been developed, there will be one more meeting in which the community can review and comment. That date has yet to be determined so stay tuned to Decatur Next for updates.


Enter your address and we’ll email you whenever we post.


Translate »

 
 
 
 


SUBSCRIBE